The sand cone method is used for field density test in our
highway construction. In the field, the dry density test is carried out for
check the compaction of layers.
Compaction is most useful for the preparation of sub base
grade and other pavement layers and in construction of embankment in order to
increase the stability and to decrease settlement. In field compaction, the
compacting moisture content is first controlled at optimum moisture content and
the adequacy of rolling or compaction is controlled by checking the dry density
achieved and comparing with the maximum dry density.
Base layer-98%
Sub base layer-98%
Type 1 layer-95%
ABC layer-100%
Road shoulder- 98%
Testing procedure:
The weight of empty sand cone is measured and then filled
with dry sand and weighted.
The soil excavated from the hole is collected and weighted.
After weighting, a specimen of soil is taken to determine it
water content.
The sand cone is placed on the test hole with the help of
the base plate and sand is allowed to run by opening the control value.
When the sand stops running, the valve is closed and the
cone is weighted with the remaining sand.
Then the dry density of soil can be calculated and the
present of compaction of otherwise the compaction is failure. Then, the
compacted place to be re-compacted and re-test.
Calculation:
- Weight of used sand: 16000mg
- Remain sand weight: 4286mg
- Density of sand: 1.349mg/cm3
- Weight of ABC: 15632.42mg
- Volume of cone: 2274cm3
- Volume of hole: 8683.47cm3
- Density of ABC: 2.48mg/cm
- Moisture content: 4.5%
- Dry density: 2.33mg/cm3
- Degree of compaction: 98%