Tower footing resistance (TFR) of each tower after it
has been erected and before the stringing of the earthwire shall be measured
during dry weather. Each tower shall be earthed and the tower footing
resistance shall not exceed 10 ohms. Pipe type earthing and counter poise type
earthing wherever required shall be done in accordance with the latest
additions and revision of
IS : 3043
|
Code of practice of Earthing
|
IS:5613
|
Code of practice for Design, Installation and
maintenance (Part-III/ section 2) of overhead power lines
|
The provision of holes on stubs shall be made as per
approved earthing drawings. The earthing will vary depending on soil
resistivity.
Counterpoise Earthing:
In locations of high resistivity soils especially in rocky locations special earthing
arrangement shall be employed in the form of counterpoise earth to bring down
the tower footing resistance to 10 ohms. The counterpoise earth shall consist
of 4 Nos. 7/3.15mm galvanized steel wires running radially from all the four
tower legs for a distance of about 15 to 70 meters. The galvanized steel wire
shall be connected to the tower legs by galvanized steel lugs forged or compressed
at its one end, complete, with 16 mm (5/8") dia bolts and nuts, required
for connecting the earthing to the tower and the other ends of the earthwire
shall be connected to an electrode of 20mm dia and 600mm long, and the
counterpoise shall be buried radially from the tower base at 600 mm below/ground
level. The lugs should be preferably covered in chimney portion of the
foundation to avoid pilferage. For soil resistivity less than 1500 Ohm-meter,
earthing shall be established by providing 4 length of 30 meter counterpoise
wire (Total 120m length wire). Otherwise for soil resistivity greater than 1500
Ohmmeter, earthing shall be established by providing 4 length of 70m
counterpoise wire (Total 280 m length wire)
super
ReplyDeleteTransmission Line Overview: Tower Earthing >>>>> Download Now
Delete>>>>> Download Full
Transmission Line Overview: Tower Earthing >>>>> Download LINK
>>>>> Download Now
Transmission Line Overview: Tower Earthing >>>>> Download Full
>>>>> Download LINK kY
if we doesn't get the clearance of 30 meters at site then what will do??
ReplyDeleteTransmission Line Overview: Tower Earthing >>>>> Download Now
ReplyDelete>>>>> Download Full
Transmission Line Overview: Tower Earthing >>>>> Download LINK
>>>>> Download Now
Transmission Line Overview: Tower Earthing >>>>> Download Full
>>>>> Download LINK
Thanks for sharing this blog. Paraflex is the leading name if searching Wire for Water Pump. We are one of the recognized company in wire and cable market.
ReplyDelete