Transmission Line Overview

Sharing Abstracts,Notes on various Electrical Engineering Topics.

  • Home
  • Survey
  • Civil
  • Structure
  • Stringing
  • OPGW
  • Cable
  • Testing
  • Distribution
  • Safety
  • Tool
  • Accessories
  • Aboutus
  • Download

Stringing

1. Guide For Ielection Of Insulator Creepage Distances
2. Conductors
3. Drum Capacity Formula
4. Tests On Conductor
5. Bundled Conductor
6. Comparison Of AAAC With ACSR
7. Dead End Clamp For ACSR Conductor
8. Hardware Manufactured Using The Components
9. Ground Wires In Overhead Transmission
10. Resistance Measurement Of Joints
11.Criteria For Choosing Stringing Blocks
12. Electric Insulator Glass
13. Birdcage (Birdcaging) of Conductor

No comments:

Post a Comment

Home

Popular Posts

  • Tower Earthing
    Tower footing resistance (TFR) of each tower after it has been erected and before the stringing of the earthwire shall be measured during...
  • What is OPGW?
    An optical ground wire (also known as an OPGW or, in the IEEE standard, an optical fiber composite overhead ground wire) is a type of ca...
  • Testing & Commissioning Procedure
    1.     PURPOSE The purpose of this document is to identify generic requirements applicable to the testing & commissioning of new Sub...
  • Guide for selection of insulator creepage distances to suit polluted conditions
    Pollution level Minimum nominal specific creepage distance(a) (mm/kV)(b) I–Light 16 II–...
  • Liverpool Splice of Steel Wire Rope
    Liverpool Splice . The liverpool splice is the easiest and most common of the wire splices to make. It is the primary splice used w...
  • Comparison of AAAC with ACSR
    COMPARISON OF AAAC WITH ACSR Aluminium alloy conductor is revolutionary break-through in conductor technology. Users al...
  • Why Surveying is important
    Surveying is an important aspect of transmission line due to the following: The objective is to optimize the cost of transmission line b...
  • Birdcage (birdcaging) in Conductor
    Formerly it was thought that the driver contact material in the grooves of grip drums brake must be of such a soft material or more than...
  • OPGW Installation Procedure
    PURPOSE Describe the system of installation and delivery of OPGW fibre optic cables. GENERAL In general, the system and the equipmen...
  • CADWELD Welded Electrical Connections
    The process of Exothermic Welding  is a method of making electrical connections of copper to copper or copper to steel in which no out...

Stringing

  • 1200 KV UHVAC
  • Advantage Disadvantages
  • Cement
  • Concrete
  • Concrete Test
  • Conductor
  • Designs
  • Earthing
  • Foundation
  • Hard Ware Fittings
  • Installation
  • Insulator
  • OPGW
  • Protection
  • Reference
  • Sag
  • Survey
  • Test
  • Tools
  • Tower Parts
  • Warning System
  • Welding

Followers

Contact Us

Name

Email *

Message *

DISCLAIMER

Some of the links, content directing to links, videos, and other references are not owned and is not stored on the site. If you feel that we need to remove any of those aforementioned elements, feel free to inform the administrator of the site.

Powered by Blogger.